EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
phowe
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (415)
Research
- (1)
Workshop
- (2)
Empennage
- (2)
Fuselage
- (71)
Firewall
- (11)
Tail Feathers
- (37)
Wings
- (86)
Controls
- (11)
Avionics
- (30)
Lighting
- (13)
Instrument Panel
- (6)
Landing Gear
- (16)
-
Nose Gear Tire
-
Nose Gear - Mount...
-
Main Gear Fuselage...
-
Nose Gear Yoke
-
Front Landing Gear
-
Attached the tundra...
-
Tundra Tires ready...
-
Inserted Innertubes...
-
Separated Rims from...
-
Separate the wheels
-
Convert to Tundra Gear
-
Brake line
-
Installed Optional...
-
Wheels and Mounting
-
Landing Gear
-
Started work on the...
Engine
- (30)
Propeller
- (7)
Fuel System
- (18)
Interior Finish
- (46)
Rigging
- (6)
Paint / Decals
- (10)
Inspection
Tools
MISC
- (12)
Builder Name:
Philip Howe
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1711.75
Total Flight Time:
6
Total Expense:
N/A
Start/Last Date:
Oct 19, 2020 - No Finish Date
Engine:
Rotax 915is
Propeller:
Whirlwind
Panel:
Dynon
Friendly URL:
https://eaabuilderslog.org?s=phowe
Home or Last Project Picture
Feb 14, 2022
Brake line
- (4 hours)
Category: Landing Gear
Mounted fittings on the calipers and drilled holes in the fuselage. Fitting on the fuselage on the right side and attached brake line in the main gear leg. It required removing one of the rear main gear bolts from each leg.
Photo Feb 14, 10 46 47 AM.jpg
Photo Feb 14, 2 11 38 PM.jpg
Photo Feb 14, 3 52 50 PM.jpg
Photo Feb 14, 3 53 02 PM.heic
Photo Feb 15, 8 28 09 AM.jpg
Photo Feb 15, 8 28 25 AM.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.